Skip to product information
1 of 7

Wukusy

Supermom Multi-function Power Blender For Beating Liquidizing And Churning

Supermom Multi-function Power Blender For Beating Liquidizing And Churning

Regular price Rs. 259.00 (GST Included)
Regular price Sale price Rs. 259.00
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity


Supermom Multi-Function Power Blender for Beating, Liquidizing, and Churning – Handheld Blender with Stainless Steel Whisk for Efficient Blending

Description :-

The Power Blender is a versatile, hand-held kitchen tool designed for beating, liquidizing, and churning tasks. With an ergonomic handle for comfort, it simplifies mixing and blending food ingredients with ease. Equipped with high-quality stainless steel whisk attachments, it ensures durability and efficiency in all your mixing needs. This easy-to-use blender is perfect for preparing batters, mixing beverages, or emulsifying sauces. Its compact design allows easy storage, making it an essential gadget for your kitchen.

Key Features :-

  • Multi-Function Use: Ideal for beating, liquidizing, and churning food.

  • Stainless Steel Whisk: Durable and efficient whisk for smooth blending.

  • Ergonomic Handle: Comfortable, non-slip handle for a secure grip while using.

  • Compact & Portable: Lightweight and easy to store in any kitchen.

  • Easy to Clean: The whisk and handle are designed for hassle-free cleaning.

  • Versatile: Suitable for various tasks, from mixing batters to preparing smoothies.

Ideal for Use :-

  • Home kitchens for daily food preparation.

  • Baking enthusiasts for mixing batters and doughs.

  • Smoothie lovers for blending fruits and liquids.

  • Busy professionals and families for quick, effective meal prep.

Specifications :-

  • Type: Handheld Power Blender

  • Material: Stainless Steel (whisk), Durable Plastic (handle)

  • Power Source: Manual operation, no batteries required

  • Blade Material: Stainless Steel

  • Handle: Ergonomically designed for comfort and control

Dimension:-

Volu. Weight (Gm) :- 351
 
Product Weight (Gm) :- 201
 
Ship Weight (Gm) :- 351
 
Length (Cm) :- 31
 
Breadth (Cm) :- 11
 
Height (Cm) :- 5

View full details